Industry news

Differences Between - Electric Shrink Tunnel and Steam Shrink Tunnel

Electric Shrink Tunnels and Steam Shrink Tunnels are both used in shrink packaging, where heat is applied to shrink plastic films around products to provide a protective or decorative cover. However, they use different methods and energy sources to achieve the shrinkage. Here are the key differences:

1. Heat Source

Electric Shrink Tunnel:

Uses electric heaters (usually electric coils or infrared elements) to generate heat.

The heat is distributed through forced hot air, which is directed at the product and film to cause the plastic to shrink.

Steam Shrink Tunnel:

Uses steam as the primary heat source.

The steam is generated from boiling water and directed into the shrink tunnel chamber where it surrounds the product and film to shrink it.

2. Temperature Control

Electric Shrink Tunnel:

Offers more precise temperature control since it uses electric heating elements. It is easier to adjust the temperature and airflow.

The temperature is generally higher (around 150°C–200°C) than in steam systems, but is more consistent and direct.

Steam Shrink Tunnel:

The temperature in a steam tunnel is controlled by regulating the steam pressure and the amount of steam injected into the tunnel.

Steam heat is gentler and can reach temperatures of around 90°C–110°C, but is harder to control compared to electric heat, especially in varying ambient conditions.

3. Shrink Efficiency

Electric Shrink Tunnel:

Typically, shrinks faster because the heat is more concentrated and evenly distributed around the product.

Can be more efficient for materials that require higher temperatures to shrink quickly (e.g., certain types of PVC or PET films).

Steam Shrink Tunnel:

May take slightly longer to shrink compared to electric tunnels since steam is less direct in terms of heat delivery.

However, steam can be effective for shrinking larger or more delicate items, as the steam’s moist heat is gentler on the product.

4. Moisture and Finish

Electric Shrink Tunnel:

Does not introduce moisture to the process, resulting in a dry shrink finish.

Ideal for products that may be sensitive to moisture or that require a clean, dry finish.

Steam Shrink Tunnel:

The steam introduces moisture into the process, which can be beneficial for shrink films that are moisture-sensitive or for products that benefit from a slight moisture finish.

Steam can also cause a more glossy or shiny finish on the shrink film.

5. Energy Consumption

Electric Shrink Tunnel:

Requires electricity to generate heat, and energy efficiency can vary depending on the design of the tunnel and the materials being used.

Generally, higher operational costs in terms of electricity consumption, especially for high-throughput production.

Steam Shrink Tunnel:

Requires water and steam generation equipment (e.g., boilers), which can lead to significant upfront infrastructure costs.

Operating costs may vary based on the efficiency of the boiler and steam distribution system, but steam may be more cost-effective in high-volume or continuous operations where steam is readily available.

6. Environmental Impact

Electric Shrink Tunnel:

May have a higher carbon footprint depending on the electricity source, especially if the electricity is generated from fossil fuels.

No water usage or waste generation beyond energy consumption.

Steam Shrink Tunnel:

Typically uses more water and requires a constant supply of steam.

If the steam is generated from renewable energy sources (e.g., biomass or geothermal), the environmental impact can be reduced.

7. Applications

Electric Shrink Tunnel:

Commonly used for smaller to medium-sized runs where speed, control, and cleanliness are critical.

Ideal for applications where precise heat is needed, such as electronics, bottles, or packages that require a dry, neat finish.

Steam Shrink Tunnel:

Commonly used in food and beverage packaging, where steam provides a gentle and uniform heat source that doesn’t over-dry the product.

Also useful for irregularly shaped or delicate products that require a gentler shrink process.

8. Maintenance

Electric Shrink Tunnel:

Generally requires less maintenance since it doesn't involve a complex steam system.

The heating elements need occasional inspection or replacement if damaged.

Steam Shrink Tunnel:

Requires more maintenance due to the steam generation system (e.g., boilers, steam pipes) and regular monitoring of water levels and pressure.

The steam system may be prone to scaling or blockages, requiring more frequent maintenance.

The choice between an electric or steam shrink tunnel depends on the product being packaged, production volume, energy costs, and environmental considerations.

CONTACT US

Contact: Kris

Phone: +86-13512184818

E-mail: sales03@sr-packing.com

Add: No. 18, Changting Road, Fengxian District, Shanghai, China